Documented Research Chronology
Dated corpus milestones, not a legal inventorship determination
This chronology records dated artifacts presently represented in the Glyphd Labs corpus. It is a provenance aid, not a legal conclusion about conception, inventorship, novelty, priority, ownership, or patent rights. Private records may predate these public-safe milestones.
March 2026 — MicroScope
- Local-model forward tensors, attentions, evidence exports, and Resolution Frontier Search checkpoint artifacts document the interpretability lane.
April 2026 — Portable AI social objects
- AnchorFeed specifies a social object organized around copy, use, return, and session memory rather than passive generated content.
May 2026 — SchemaStack Signal Gate
- Schema arbitration, actionability, expression gating, benchmark plans, and the local live audit are documented.
June 2026 — WorkPage OS and visual-production systems
- WorkPage OS v1/v1.1 defines typed plans rendered into static interactive task surfaces.
- Visual mockup preservation, image-first production, shot-packet compilation, and Omni sequence routes are documented.
July 4, 2026 — LCSM / Backboard
- The LCSM Workbench specification records canonical state, append-preserving correction, provenance, two-note commit, journal, and receipt mechanics.
July 10–12, 2026 — FOVEA, OOC, Glyph Desk, and Haygent
- FOVEA address, navigation, landmark, and foveated-retrieval specifications are recorded.
- OOC /
fold/2is separated as the representation and compression lane. - Glyph Desk consolidates Chat–Plan–Make over one Project Core.
- Haygent specifies deterministic spines containing bounded intelligence slots.
July 15, 2026 — 4B Max-Flex and spatial projections
- The compact-model runtime, PromptCapsules, SurfaceDelta, foveated retrieval, cache-aware layout, and mobile benchmark gates are recorded.
- Context Corolla, Workfield, and related spatial state projections are consolidated.
July 18–21, 2026 — Glyphd V1, Continuity Core, and EL-JEFFE
- Architectural Home invariants, place-declared state, consent thresholds, and matched projection experiments are documented.
- Continuity Core gap analysis defines account-level identity, checkpoints, and project resurrection.
- EL-JEFFE 4B provides the specification and build-control package, schemas, gates, and Phase 0 verification.
July 24–25, 2026 — GlyphCAS and MCE-1
- GlyphCAS documents exact and semantic identity separation, contextual reuse, dependencies, representation routes, and a ten-test reference package.
- MCE-1 defines the Minimum Complete Economy contract, constitutional invariants, governed transitions, Cells, Hooks, Plugs, Tunnels, and the water-crisis trace.
July 27, 2026 — Actor–Agent and institute compilation
- The Actor–Agent Runtime records persistent Actor Capsules, temporary agent processes, limited knowledge, World Patches, and deterministic scheduling.
- Glyphd Labs consolidates the research into public-safe papers, notes, demos, benchmarks, source manifests, claim ledgers, and diagrams.